Monday 30 November 2009

Saturday busy buzzing


Saturday was way busy around our home and garden. At the edge of the garden there is a utility pole, and early morning I heard the sound of too many trucks on the road for our quiet neighbourhood. There were three or four truck from the electric company, and they proceeded to set up to adjust the tension in the power cables. They first installed bridging cables, when there was some buzzing as the connections were made, when the air became tainted by the smell of electrical burn, weld. Then the cables were cut, shortened and connectors fitted, with the cables reconnected, and the bridging wires removed. It took them 6 hours to achieve all of this for four cables. Here is a photo of them working with the bridging cables.

No comments:

Post a Comment